Traffic

Baltimore County, southern Harford County lane closures announced for October 4 – 11

BALTIMORE, MD—The Maryland Department of Transportation has announced major lane closures for the coming weekend and week in Baltimore County.

Officials say the closures could impact travel for those driving in the area. All work is weather permitting.

The planned closures include the following:

Baltimore County



MD 140 (Reisterstown Rd.) between Pleasant Hill Rd. and Stocksdale Ave. – County Waterline Replacement and State Highway Improvements – Daytime single-lane closures and traffic shifts 9 a.m. – 3 p.m. weekdays and if needed, overnight single lane closures 9 p.m. – 5 a.m. Sunday – Thursday, through late fall 2024.  Original traffic alert available here.
I-95/I-695 Southwest Interchange – 10 Bridges Rehabilitation – Expect the following overnight single and double lane closures, and overnight interchange ramp closures/detours between Sunday night, October 6 and Thursday, October 3, 2024.
• SB I-95 at I-695 (single and double lane closures)
• Sulphur Spring Road underneath I-95 (flagging)
• Ramp from I-695 EB to I-95 SB
• Ramp from I-695 IL -WB to I-95 SB
Additional details are available at the above Project Portal page link.
I-695 from I-70 to MD 43 (White Marsh Boulevard) Transportation Systems Management and Operations (TSMO) – Expect the following single lane closures along I-695 between Sunday night October 6 and Friday, October 4
• I-695 Inner loop from US 40 to Charles St (Left Lane Closure)
• I-695 Outer loop from Charles St. to US 40 (Left Lane Closure)
• I-695 Outer loop from Charles St to US 40 (Intermittent Right Lane closure)
 Additional details are available at the above Project Portal page link.
MD 144 from Howard County Line/Oella Avenue to MD 166 (South Rolling Road) – Highway maintenance paving work on three segments of MD 144 through late-fall 2024.  Motorists can expect overnight lane closures with flagging operations along these sections of MD 144, 9 p.m.– 5 a.m., Sunday through Thursday. MD 144 from Howard County line/Oella Avenue to River Road (Patch, mill and resurface) ; MD 144 from River Road to North Rolling Road (Patch) MD 144 from North Rolling Road to MD 166  (Patch, mill, resurface). Information available here.
MD 7 from west of King Ave. to Campbell Blvd. –Resurfacing -Overnight lane closures with flagging operations 8 p.m. – 5 a.m., Sunday through Thursday, through late fall.  Traffic alert available here.
MD 139 (Charles Street) City/County line to MD 134 (Bellona Ave.)  – Waterline replacement and roadway improvements. Single lane closures northbound and southbound (with aux/turn lane closures where needed at intersections). Daytime 9 a.m. – 3 p.m. Monday – Friday and overnight 8 p.m. – 5 a.m. Sunday – Thursday, through fall 2026.
MD 140 (Reisterstown Rd.) I-695 to Owings Mills Blvd. (MD 940) – “Smart Signals” Corridor Traffic Signal System Improvements. Temporary overnight lane closures along MD 140 in the vicinity of one or more signalized intersections at a time within the project limits. 9 p.m. – 5 a.m. Sundays through Thursdays. Traffic alert for MD 140 signals available here.
MD 140 (Reisterstown Rd.) between Pleasant Hill Rd. and Stocksdale Ave. – County Waterline Replacement and State Highway Improvements – Daytime single-lane closures and traffic shifts 9 a.m. – 3 p.m. weekdays and if needed, overnight single lane closures 9 p.m. – 5 a.m. Sunday – Thursday, with final paving work beginning late fall 2024.  Traffic alert available here
MD 542 (Loch Raven Blvd.) from south of Taylor Ave. to East Joppa Road – Baltimore Co. DPW/SHA joint project for County Waterline replacement and SHA roadway improvements. Single lane closures northbound and southbound Daytime 9 a.m. – 3 p.m. Monday – Friday and overnight single lane closures 9 p.m. – 5 a.m. with double lane closures (with aux/turn lane closures where needed at intersections). 10 p.m. – 5 a.m. Sunday – Thursday, through fall 2026.
MD 542 (Loch Raven Blvd.) at Loch Hill Road – Drainage Pipe Replacement – 24/7 right lane and sidewalk closure on northbound MD 542 in vicinity of Loch Hill Road intersection through late October. Traffic alert available here.
MD 702 between Middleborough Road and Back River Neck Road, including the roundabout at Hyde Park Road. – Highway maintenance resurfacing – daytime lane closures for paving work on the mainline of MD 702 with flagging operations on weekdays, with overnight roundabout work with detours overnights through mid-fall. More information is available on the traffic alert here.
Southern Harford County
US 1 (Bel Air Bypass) between Tollgate Road and MD 147 (Harford Road) – Guardrail replacement project. Weekly single-lane closures between 9 a.m. and 3 p.m. until November.

Photo via Pixabay


Do you value local journalism? Support NottinghamMD.com today.