Traffic

I-695/Broening Highway interchange set to reopen

BALTIMORE, MD—The I-695/Broening Highway interchange is set to reopen on Wednesday, May 15, 2024, according to the Maryland Transportation Authority.

Access to Broening Highway is via existing turnaround from Inner Loop I-695, onto Outer Loop, to Broening Highway (Exit 44).



Inner loop traffic destined for Broening Highway must use MD 151/North Point Boulevard (Exit 42) and follow detour to return to the Inner Loop.  The last exit from the Inner Loop remains Exit 42.

In addition, access to I-695 Outer Loop from Broening Highway will be open via existing turnaround. I-695 Outer Loop will be one lane through the I-695 Sparrows Point Project work zone. Tolled access to Broening Highway and I-695 Outer Loop via turnaround will resume on June 1, 2024.

Motorists are encourages to stay alert and obey posted speed limits/traffic control devices.


Do you value local journalism? Support NottinghamMD.com today.